Government Of Assam Kamrup District

Development Activities of Kamrup District

    PHE DEPARTMENT

    Water Supply and Sanitaion in Kamrup District

    (Period 2001-2005)

     

              To cater the need of safe drinking water of uncovered habitations, based on the status survey of 1991, GOI has launched different water supply programmes. The Status of different programmes for the period 2001-2005 is outlined below:

     

              Accelerated rural water supply programme (ARWSP)

             

              Under ARWSP During the period of 2001-05, altogether 79 nos. of PWS schems and 939 spot sources have been taken up for execution in the district, out of which 15 nos. have been completed in all respect, 27 nos. have been commissioned and 37 nos. are ongoing schemes and all the spot sources have installed as shown below-

     

              A) Physical:

    Pro-

    gramme

    Year

    PWSS

    Spot Source

    Total

    Cpmpleted

    Commissioned

    Under Execution

    SHP

    THP

    M-III

    RW

    ARP

    2001-02

    9

    5

    3

    1

    0

    0

    0

    0

    2002-03

    7

    2

    4

    1

    0

    0

    0

    0

    2003-04

    10

    5

    5

    0

    0

    0

    0

    0

    2004-05

    53

    3

    15

    35

    516

    156

    11

    233

    Total

    79

    15

    27

    37

    516

    156

    11

    256

     

              B. Finacial (Rs. in lakhs)     

    Programme

    Year

    Fund Received

    Expenditure

    ARP

    2001-02

    219.16

    219.16

    2002-03

    158.00

    158.00

    2003-04

    125.50

    125.50

    2004-05

    423.30

    423.30

    Total

    925.76

    925.76

     

             

     

     

     

              Sector Reform pilot project (SRPP):

     

              The community based water supply project, Sector Reform Pilot Project, was launched in the district in the year 2000 on demand responsive approach and the project was closed on 31.03.04 In the district, altogether 7 nos. of PWSS (2 nos. New and 5 nos. Rejuvenation) have been executed and 692 nos. of spot source have been installed. The O & M of all the aompleted schemes are being carried out by villege level water and sanction committee (VWCC). The detail of schemes are shown below.

     

              A. Physical:

    Pro-

    gramme

    Year

    PWSS

    Spot Source

    SRPP

    Total

    Cpmpleted

    Commi

    ssioned

    Under Execution

    SHP

    THP

    M-III

    RW

    2002-03

    0

    0

    0

    0

    169

    31

    0

    26

    2003-04

    7

    5

    2

    0

    348

    50

    0

    68

    Total

    7

    5

    2

    0

    517

    81

    0

    94

    (76)

              B. Financial (Ra. in lakhs)

     

    Programme

    Year

    Fund Received

    Expenditure

    GOI

    CC & other

    Total

    SRPP

    2002-03

    280.50

    28.16

    308.66

    140.73

    2003-04

    142.02

    30.58

    172.6

    318.002

    Total

    422.52

    58.74

    481.26

    458.732

     

    Swajal Dhara:

              On 25.12.2002, the Honorable Prime Minister of India launched the Swajaldhara programme throughout the country in rural drinking water supply sector.

               Involvement of the three tiers PRI through community contribution (10% capital cost share), requisite social mobilization, communication and capacity development process are considered to be important component of the project. In the district, altogether 11 nos. of PWS schemes are being executed as shown below and the schemes are expected to be completed by the end of this year.

     

     

     

     

     

     

     

    1. Physical:

     

    Programme

    Year

    PWSS

    Spot Source

     

    Swajal Dhara

    Total

    Cpmpleted

    Commi

    ssioned

    Under Execution

    SHP

    THP

    M-III

    RW

    2002-03

    08

    0

    0

    8

    0

    0

    0

    0

    2003-04

    06

    0

    0

    6

    0

    0

    0

    0

    Total

    14

    0

    0

    14

    0

    0

    0

    0

     

     

              B.  Financial (Rs. in lakhs):

    Progrmme

    Year

    Fund Received

    Expenditure

    Swajal Dhara

    GOI

    Benf & other

    Total

    2002-03

    88.815

    14.582

    103.397

    94.185

    2003-04

    67.455

    12.438

    79,893

    58.963

     

    156.27

    27.02

    183.29

    153.148

     

     

             

    Sanitation :

     

              The total Sanitation campain project was sanctioned by GOI in the year 2000 for total project cost of Rs. 206.74 lakhs with a target of 20800 LCSL for BPL families and 138 School sanitary blocks. Till date in the district 7343 nos of LCSL for BPL household and 30 nos. of School Sanitary Blocks have been constructed under this project against the 30% GOI share received (i.e. Rs. 40.83 lakhs) and GOA share received Rs. 5.80 lakhs.

     

    Progr-amme

    Year

     

    Physical

    Financial

     

    IHHL for BPL

    SSB

    Fund Received

    Expenditure

    GOI

    GOA

    Bnef.

    Total

    TSC

    2003-04

    5235

    27

    40.83

    5.80

    7.168

    53.798

    18.275

    2004-05

    2108

    03

    -

    -

    2.958

    2.958

    30.123

    Toal

     

    7343

    30

    40.83

    5.80

    10.216

    56.756

    48.398

     

     

     

    PM's Announcement Programme (PMAP):

     

              The Prime Minister of India announced the programme on 15.08.02 to install hand pump in water scarce areas & rural schools includig revival of traditional water sources. Under this, programme altogether 692 nos. of Spot sources have been installed in the district during the period as shown below.

     

              a. Physical:

     

    Pro-

    gramme

    Year

    PWSS

    Spot Source

    PMAP

    Total

    Completed

    Commi

    ssioned

    Under Execution

    SHP

    THP

    M-III

    RW

    2004-05

    -

    -

    -

    -

    422

    204

    66

    -

    Total

    -

    -

    -

    -

    422

    204

    66

    -

     

              b. Finacial:

     

    Programme

    Year

    Fund Received

    Expenditure

    PMAP

    2004-05

    75.00

    75.00

    Total

    75.00

    75.00

    IRRIGATION DEPARTMENT

    PWD ROADS

     

    Public works Department (Roads)

     

    1. PWD Annual Plan:

     

              Under PWD Annual Plan, 2001-02, 11(eleven) nos. of Road Schemes were taken up and completed with total fund involvement of Rs. 194.09 lakhs. Total amount spent for completion of the works was Rs. 192.75 lakhs.

     

              The status of the Road Schems during 2001-02 is indicated below:-

     

    Sl. No

    Name of the Scheme/Programme

    Total Fund Involved

    (Rs. In lakhs)

    Total Expenditure Incurred

    Physical Progress

    1

    NG Mandakata road

    21.49

    21.20

    100%

    2

    Dumunichowki Saraighat Ulta. Simlibari Road

    25.00

    25.00

    100%

    3

    Rangmahal Changsari road

    21.93

    21.25

    100%

    4

    Matakher Road

    10.00

    10.00

    100%

    5

    P.L. Rajapara Road

    10.00

    10.00

    100%

    6

    Rajapara Borigaon Road

    10.00

    10.00

    100%

    7

    Rajapara Chandubi road

    10.00

    10.00

    100%

    8

    Muduki Longsai Road

    10.00

    10.00

    100%

    9

    Hekra Nagarbera Road

    28.99

    28.90

    100%

    10

    Singra Hekra Road

    24.76

    24.50

    100%

    11

    Fullung Lenga Road

    21.92

    21.90

    100%

     

    Total

    194.09

    192.75

    --

     

              Under PWD Annual Plan 2002-2003, 8(eight) nos. of Road Schemes taken up and completed with total fund involvement of Rs. 179.00 lakhs.

              The Status of the Road schemes during 2002-03 in indicated below:-

     

    Sl. No

    Name of the Scheme/Programme

    Total Fund Involved

    (Rs. in lakhs)

    Total Expenditure Incurred

    (Rs. in lakhs)

    Physical Progress

    1

    Dalibari Muslimsupa Road

    20.00

    20.00

    100%

    2

    Pacharia Sigimari Road (Collage Approach)

    24.00

    24.00

    100%

    3

    Rangmahal Changsari Road

    20.00

    20.00

    100%

    4

    Gandhmou Bangshar Road

    22.00

    22.00

    100%

    5

    Gogmunchiali Road

    22.00

    22.00

    100%

    6

    Athiabari Bonmaja Road

    24.00

    24.00

    100%

    7

    Bhetamukh to Baralabari Road

    22.00

    22.00

    100%

    8

    Pizupara Hariduva Road

    25.00

    25.00

    100%

     

    Total

    179.00

    179.00

    --

     

             

     

     

              Under PWd Annual Plan, 2003-04, 16(sixteen) nos of total Scheme have been taken up with total fund involvement of Rs. 856.042 lakhs, out of which an amount of Rs. 746.00 lakhs has been spent. Out of 16 nos of Schemes, works selecting to 11 nos. of Schemes have been already been completed. Remaining 5 nos. of Schemes are ongoing under Annual Plan, 2003-04.

     

              The Status of the Schemes during 2003-04 is indicated below:-

     

    Sl. No

    Name of the Scheme/Programme

    Total Fund Involved

    (Rs. in lakhs))

    Total Expenditure Incurred

    (Rs. in lakhs)

    Physical Progress

    1

    Sigra Hekra Road

    50.0

    50.00

    100%

    2

    Bamunigaon Santipur Road

    50.00

    50.00

    100%

    3

    Pizupara Haridova Road

    25.00

    25.00

    100%

    4

    Mandira Nichalamari Road

    25.00

    25.00

    100%

    5

    Inspection Benglow at Amingaon

    27.464

    27.50

    100%

    6

    Fulung Lenga raod

    18.62

    18.50

    100%

    7

    Arjantal Bhomlahati (Bezsupa) Road

    30.02

    30.00

    100%

    8

    Sualkuchi Purbanchal Road

    106.73

    80.00

    95%

    9

    Gandhmow Bangshar Road

    79.812

    70.00

    98%

    10

    Changsari Nathgaon Road

    39.115

    10.00

    50%

    11

    North Guwahati Ferry approach Road

    165.87

    165.00

    100%

    12

    Dhopatari Silabharal Muslimsupa Rd.

    5.176

    5.00

    100%

    13

    n.G. Mandakata Road

    107.16

    100.00

    100%

    14

    Bhurgaon Helagog Road

    50.00

    50.00

    100%

    15

    Amingaon Hariapatty Road

    26.075

    15.00

    90%

    16

    Pakhamela road

    50.00

    25.00

    50%

     

    Total

    856.042

    746.00

    --

     

              Under PWD Annual Plan, 2004-05, 5(five) nos of total Scheme have been taken up with total fund involvement of Rs. 159.58 lakhs, out of which an amount of Rs. 49.90 lakhs have already been spent. Out of five nos. of Schemes, one scheme has already been completed.

     

              The Status of the road Schemes during 2004-05 is indicated below: -

     

    Sl. No

    Name of the Scheme/Programme

    Total Fund Involved

    (Rs. in lakhs)

    Total Expenditure Incurred

    (Rs. in lakhs)

    Physical Progress

    1

    Simlitola Nagarbera Road

    29.00

    Nil

    60%

    2

    Mandira Nichalamari Road

    30.00

    Nil

    50%

    3

    Nagarbera Namasadrapara road

    21.00

    Nil

    40%

    4

    Batorhat Chimina road

    49.98

    49.90

    100%

    5

    Mirza Lowershipment Raod

    29.60

    Nil

    --

     

    Total

    159.58

    49.90

    --

     

     

     

     

     

    1. Central Assistance Scheme:

     

              Under Central Assistance Scheme for 2002-03 one road sheme, namely, Barkhat Borni Road with the total fund of Rs. 469.74 lakhs has been taken up and 85% progress has been achieved.

    3. Centrl Road Fund:

              Under Central Road Fund for 2001-2002, one road scheme, namely, Singimari Bongshar Sualkuchi road with the total fund of Rs. 696.26 lakhs has been taken up and 99% of the works have been completed with a total expenditure of Rs. 605.50 lakhs.

     

              Under Central Road Fund for 2002003, one road scheme, namely, PL Rajapara PWD road with the total fund of Rs. 350.00 lakhs has been taken up and 90% of the works have been completed with the total expenditure of Rs. 234.00 lakhs.

     

    1. RIDF-IX for 2004-05

     

              Under RIDE-IX for 2004-05, construction work of 7 nos. of RCC Bridges have been taken up and the works are in progress. The bridges have been started on Kendukona-Changsari Road(two bridges), Hekra-Nagarbera Road,Chaygaon -Gumi road, Palashbari-Loharghat-Rajapara Road and Rangmahal-Changsari Road (two bridges), total fund involved against the bridges is Rs. 868.01 lakhs.

     

    1. NLCPR for 2004-05:

     

              Under NLCPR for 2004-05, construction works of two nos. of RCC Bridges have been taken up with a total cost of Rs. 224.24 lakhs.

     

    6. MPNA for 2004-05:

              Under MPNA for 2004-05, 8(eight) nos. of roads have been taken up for construction with total fund involvement of Rs. 978.56 lakhs.

     

    *****

     

     

    Acievements under PMGSY works in Kamrup district

    during last four years w.e.f. 2001-02

     

              The Achievements under PMGSY works in Kamrup district are indicated below:-

     

    A) PMGSY Roads, 2001-02

     

                       i) Total sanctioned estimated Amount       :         Rs. 723.57 lakhs

                       ii) Up to date expenditure                 :         Rs. 662.23 lakhs

                       iii) Total nos. of Packages taken up          :         5 nos.

                       iv) Total nos. of roads taken up       :         12 nos.

                       v) Total road length covered            :         26.575 kms.        

                       vi) Total no. of CD works completed        :         i) HPC :      28 nos.

                                                                                           ii) RCC bridge: 1 no.

    1. Package No. AS-1101/2001-02

     

    Sl. No.

    Name of Roads

    Physical Progress

    (Percentage)

    1

    Panitema-Kendukona Road

    100%

    2

    Behapara Kaurbaha Road

    100%

    3

    Naokata-Suagpur road

    100%

     

     

     

     

     

              2. Package No. AS-1102/2001-02

     

    Sl. No.

    Name of Roads

    Physical Progress

    (Percentage)

    1

    Dhupartal-Majuli road

    100%

    2

    Chandrapur-Missamari Road

    100%

     

    3 Package No. AS-1103/2001-02

     

    Sl. No.

    Name of Roads

    Physical Progress

    (Percentage)

    1

    Jharubari-Jogi Road

    100%

    2

    Naukuchi-Markong Road

    100%

     

    1. Package No. AS-1104/2001-02

     

    Sl. No.

    Name of Roads

    Physical Progress

    (Percentage)

    1

    Hajo Chapari-Ramdia Halogaon Road

    100%

    2

    Rowmari Pakorkona Road

    100%

    3

    Similibari -Saraighat Road

    100%

     

    1. Package No. AS-1105/2001-02

     

    Sl. No.

    Name of Roads

    Physical Progress

    (Percentage)

    1

    Hekra Jogipara Road

    100%

    2

    Barkhat-Tarigaon Road

    100%

     

     

     

     

     

     

    B) PMGY Roads, 2002-03 (Fund not provided)

     

    C) PMGSY roads, 2003-04

     

                       i) Total sanctioned estimated Amount       :         Rs. 1696.30 lakhs

                       ii) Up to date expenditure                          :         Rs. 1086.40 lakhs

                       iii) Total nos. of Packages taken up                   :         7 nos.

                       iv) Total nos. of roads taken up                 :         9 nos.

                       iv) Total road length to be covered  :       60.387 kms.

                       v) Total no. of CD works completed  :     HPC: 107 nos, RCC bridge: 11nos.

    Sl. No.

    Package No.

    Name of Roads

    Physical Progress

    (Percentage)

    (1)

    (2)

    (3)

    (4)

    1

    AS-1106/2003-04

    Boko Chamaria via alekjari Road

    78%

    2

    AS-1107/2003-04

    Gouripur to Bezera Road

    85%

    3

    AS-1108/2003-04

    Murara Kelenchuk Road

    63%

    4

    AS-1109/2003-04

    Kamalpur Borka Road

    92%

    5

    AS-1110/2003-04

    Hajo Ramdia Hologaon Road

    45%

    6

    AS-1111/2003-04

    i) Kalutali to Goroimari road

    100%

    ii) Boko Pairanga Road

    100%

    7

    AS-1112/2003-04

    i) NH-31 to Banglamara Road

    95%

    ii) Dhopguri to Ouguri Road

    50%

     

    D) PMGSY Roads 2004-05

                       i) Total sanctioned estimated Amount       :         Rs.    1702.45 lakhs

                       ii)Up to date expenditure                  :         414.00 lakhs

                       iii)Total nos. of Packages taken up           :         8 nos.

                       iv)Total nos. of roads taken up        :         15 nos.

                       v) Total road length covered            :         51.179 kms.

                       vi) Total no. of CD works completed        :         HPC=68 nos, RCC=3nos.

     

    Sl. No.

    Package No.

    Name of Roads

    Physical Progress

    (Percentage)

    (1)

    (2)

    (3)

    (4)

    1

    AS-1113/2004-05

    i) Jogipara to Silobari Road

    63%

    ii) Dakuapara to Raipara Road

    50%

    2

    AS-1114/2004-05

    i) Passomtola to Pachimdhuli Road

    42%

    ii) Agumi to Hatipara Road

    41%

    3

    AS-1115/2004-05

    i) Sualkuchi to Bamundi Road

    15%

    ii) Hajo to Ukhura Road

    Just Started

    4

    AS-1116/2004-05

    i) Bakrapara to DK Vidyapith H.S. Road

    45%

    ii) Nahira to Guimara Road

    45%

    5

    AS-1117/2004-05

    i) Rani to Garal Road

    12%

    ii) Naukuchi to Markong Road

    32%

    6

    AS-1118/2004-05

    i) Sualkuchi to Srihati Road

    22%

    7

    AS-1119/2004+-05

    i) Baihata to Barka via Boragog Road

    20%

    ii) Rangia to Hajo via Rangia College

    30%

    8

    AS-1120/2004-05

    i) Murara to Boronghati Road

    30%

    ii) Rangia to Dhamdhama Road

    25%

     

    PMGSY Roads 2005-06

     

                       i) Estimates submitted for                :         Rs.    2692.65 Lakhs

                       ii) Total nos. of Packages taken up           :         12 nos.

                       iii) Total nos. of roads taken up       :         21 nos.

                       iv) Total length to be covered          :         71.98 kms.

                       v) Up to date position                       : All DPR under process of sanction.

     

    N.B. Progress report has been prepared on the basis of Report Submitted by S.E. PwD (Roads), Guwahati vide letter No. T/COM/2002/53/pt/1760 dated 13-06-05.

     

    PWD BUILDING

    PWD Department (Building)

              During 2001-02, 8(eight) nos. of schemes have been taken up with total fund involvement of Rs. 506.469 lakhs. During the year all the schemes have been completed and the building have been handed over to the Health /Department.

              The status of the schemes have been indicated as follows: -

    Year = 2001-2002

    Sl. No.

    Name of the Scheme/Programme

    Total Fund involvement

    (Rs. In lakhs)

    Total expenditure incurred (Rs. In lakhs)

    Physical progress

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    1

    Construction of 30 bedded Rural Hospital at Goroimari`

    220.02

    220.02

    100%

    2

    Completion of half done work of Nagarbera CHC

    91.50

    91.50

    100%

    3

    Completion of 30 bedded Rural Hospital at Sualkuchi

    53.46

    53.46

    100%

    4

    Up gradation of Bamunigaon PHC to CHC at Bongaon

    48.299

    48.299

    100%

    5

    Repairing & Renovation and Completion of half done work including boundary wall of Dadara PHC

    20.60

    20.60

    100%

    6

    Repairing and Renovation of Changsari State Dispensary with Staff Quarter

    22.70

    22.70

    100%

    7

    Repairing and Renovation of North Guwahati PHC at North Guwahati

    21.39

    21.39

    100%

    8

    Repairing and Renovation of Bezera CHC with Staff Quarter

    28.50

    25.00

    100%

     

    Total

    506.469

    502.969

    --

     

              During 2002-03, 20 (twenty) nos. of schemes have been taken up and completed with total fund involvement of Rs. 232.66 lakhs by the PWD (Building) Department.

              The details status of the schemes have been indicated as below:-

    Year = 2002-003

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    1

    Upgradation of Bondapara Sub-Centre to PHC at Bondapara

    14.68

    14.68

    100%

    2

    Repairing and Renovation of State Dispensary at Khetri.

    9.40

    9.40

    100%

    3

    Repairing and Renovation of Moloibari PHC with Staff Quarter.

    4.45

    4.45

    100%

    4

    Repairing and Renovation of Nortap PHC with Staff Quarter.

    6.17

    6.17

    100%

    5

    Repairing of Lokhra Sate Dispensary with Staff Quarter.

    8.65

    8.65

    100%

    6

    Repairing and Renovation of Panikhaiti PHC (Main Blidg at Chandrapur)

    1.5

    1.5

    100%

    7

    Repairing & Renovation of Moniari Tiniali State Dispensary

    10.12

    10.12

    100%

    8

    Repairing & Renovation of Jharobari State Dispensary with Staff quarter.

    10.87

    10.87

    100%

    9

    Repairing & Renovation of Azara CHC with staff quarter

    5.20

    5.20

    100%

    10

    Repairing & Renovation of Goral PHE with staff quarter

    7.02

    7.02

    100%

    11

    Repairing & Renovation of State Dispensary at Dhopguri with staff quarter

    9.55

    9.55

    100%

    12

    Repairing & Renovation of State Dispensary at Hahim with staff quarter

    11.29

    11.29

    100%

    13

    Repairing & Renovation with staff quarter RFNT Central doctors quarter at Nagarbera

    11.77

    11.77

    100%

    14

    Repairing & Renovation with staff quarter of Sontali PHC

    10.51

    10.51

    100%

    15

    Strengthening of Gumi PHC with staff quarter

    11.84

    11.84

    100%

    16

    Repairing & Renovation with staff quarter of Chaygaon CHC at Chaygaon

    14.68

    14.68

    100%

    17

    Strengthening of Jorshimoli SHC with staff quarter.

    11.73

    11.73

    100%

    18

    Repairing & Renovation and strengthening of Mirza CHC

    13.13

    13.13

    100%

    19

    Construction of Residential Building Gr-III Judicial Magistrate at Hajo.

    13.51

    13.51

    100%

    20

    Construction of Hajo CHC under PMGY Scheme.

     

     

     

    a) Gr-IV quarter

    9.12

    9.12

    100%

     

    b) Gr-III quarter

    14.83

    14.83

    100%

     

    c) Doctors quarter

    12.77

    12.77

    100%

     

    d) Main Hospital Building.

    7.07

    7.07

    100%

     

    e) Compound fencing & approach road

    2.80

    2.80

    100%

     

    Total

    232.66

    232.66

    --

     

              During 2004-05, only three nos. of Schemes have been taken up by the PWD(Building) Department with total fund involvement of Rs. 17.70 lakhs. Total expenditure incurred during the year was Rs. 12.99 lakhs. All the Schemes have been completed during the year.

              The Status of the Schemes are indicated below:-

     

    Year = 2004-05

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    1

    Strengthening of Sualkuchi CHC (approach road)

    3.98

    3.20

    100%

    2

    Renovation of Main CHC building at Sualkuchi

    9.79

    9.79

    100%

    3

    Construction of Boundary wall around the South West side of Jyoti Chitraban Flim Society

    3.93

    Nil

    100%

    Total

    17.70

    12.99

    --

     

     

    SERICULTURE DEPARTMENT

    Sericulture Department

     

    The status of Sericulture Department during last four years in the district of Kamrup is indicated in the following table –

     

    Sl. No.

    Year

    Name of scheme/ programme

    Total fund involved (Rs. In lakhs)

    Total expenditure incurred (Rs. In lakhs)

    Physical progress (In %)

    Beneficiaries covered (Nos.)

    Area covered  (In acre)

    Reason for shortfall if any

    1

    2

    3

    4

    5

    6

    7

    8

    9

    1

    2001-02

    1. Eri

    8.109

    8.109

    77.32

    30

    30

    Nil

    2. Muga

    11.156

    11.156

    83.54

    40

    20

    -do-

    3. Mulberry

    2.422

    2.422

    30.52

    -

    -

    -do-

    2

    2002-03

    1. Eri

    7.501

    7.501

    81.74

    63

    63

    Nil

    2. Muga

    7.322

    7.322

    65.73

    -

    -

    -do-

    3. Mulberry

    2.708

    2.708

    38.03

    -

    -

    -do-

    3

    2003-04

    1. Eri

    7.114

    7.114

    96.5

    227

    213

    Nil

    2. Muga

    7.856

    7.856

    81.05

    26

    13

    -do-

    3. Mulberry

    2.923

    2.923

    14.2

    5

    2.5

    -do-

    4

    2004-05

    1. Eri

    5.770

    5.770

    92.2

    88

    82

    Nil

    2. Muga

    6.622

    12.30 (w)

    6.622

    12.30 (w)

    96

    90

    24

    -do-

    3. Mulberry

    2.8860

    2.8860

    9.2

    22

    5.5

    -do-

    INDUSTRIES DEPARTMENT

    Industries and Commerce Centre, Kamrup

     

    1. PMRY : Under PM/RY an amount of Rs. 855.35 lakhs has been disbursed against 2474 nos of proposals during last four years w.e.f. 2001-2002 to 2004-2005.
    2. KVIC: Under KVIC, the amount disbursed was Rs. 142.80 lakhs against 132 nos. of beneficiaries covering 15 nos. of Development Blocks in the district.
    3. General Bank Finance: Under General Bank Finance Scheme, an amount of Rs. 33.05 lakhs was disbursed against 41 nos. of beneficiaries.
    4. CIC: Total Revenue earned through the Community Information Centres in the district was Rs. 9.97 laks during the period from 2001-02 to 2004-05.
    5. CMSY: Under CMSY, 44 nos. of Trainees have already completed Training programme.
    6. Permanent Registration: During the period, 802 nos. of Handicraft Units and 654 nos. of SSI Units were provided with Permanent Registration.
    7. Subsidies: During the period, 60 nos. of beneficiaries were provided with 30% SCIS, 7 nos. of beneficiaries were provided with Interest subsidy on working capital, 12 nos. of beneficiaries were provided with power subsidy and 5 nos. of beneficiaries were provided with Diesel Generating Set Subsidy.
    8. Margin Money Scheme: Under Margin Money Scheme of Assam Khadi and Village Industries Board, 80 nos. of beneficiaries were covered in 2001-02, 95 nos. were covered in 2002-03, 105 nos. were covered in 2003-04 and 158 nos. were covered in 2004-05, in the district.

    Status of Block wise achievements during the period are indicated below:-

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Statements showing the details position on implementation of different Industrial scheme by DICC, Kamrup district in the different areas of the District (2001-2005)

     

    Sl.

    No

    Name of

    Block

    PMRY

    KVIC

    General Bank Finance

    Nos. of

    Cases

    Sanctioned

    Amount

    Distributed

    (Rs. In Lakhs)

    Nos. of

    Cases

    Sponsored

    to Bank

    Nos. of

    Beneficiaries

    Amount

    Disbursed

    (Rs. In Lakhs)

    Nos. of

    Cases

    Sponsored

    to Bank

    Nos. of

    Beneficiaries

    Amount

    Disbursed

    (Rs. In Lakhs)

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    (vi)

    (vii)

    (viii)

    (ix)

    (x)

    1

    Rani

    241

    78.70

    53

    7

    7.5

    27

    5

    4.50

    2

    Chayani

    198

    51.40

    38

    6

    4.00

    17

    Nil

    Nil

    3

    Rampur

    52

    5.40

    32

    6

    4.50

    11

    Nil

    Nil

    4

    Chaygaon

    133

    29.78

    45

    6

    10.50

    14

    2

    1.50

    5

    Boko

    147

    43.81

    46

    8

    8.45

    18

    2

    3.00

    6

    Bongaon

    31

    2.00

    11

    1

    1.00

    3

    Nil

    Nil

    7

    Chamaria

    61

    17.70

    37

    2

    2.60

    8

    Nil

    Nil

    8

    Goroimari

    64

    15.56

    6

    1

    95

    3

    Nil

    Nil

    9

    Hajo

    239

    103.31

    96

    12

    10.50

    47

    7

    4.75

    10

    Sualkuchi

    205

    78.95

    108

    25

    33.50

    67

    15

    11.80

    11

    Bezera

    228

    74.41

    56

    11

    12.00

    35

    1

    1.00

    12

    Bihdia Jajikona

    222

    84.80

    38

    8

    7.00

    19

    2

    1.00

    13

    Kamal pur

    192

    120.02

    36

    7

    7.00

    29

    2

    2.00

    14

    Rangia

    362

    125.40

    101

    19

    21.80

    47

    5

    3.50

    15

    Goreswar

    99

    24.11

    48

    13

    11.50

    18

    Nil

    Nil

    Total

    24.74

    855.35

    751

    132

    142.80

    363

    41

    33.05

     

    STAtements showing the details position on implementation of different Industrial scheme by DICC, Kamrup, in the different areas of the District (2001-2005)

     

    Sl

    No

    Name of block

    CIC

    CMSY

    Permanent Registration

    Remarks

    Revenue

    Earned

    Nos. of Trainees

    Completed

    Training

    Nos. of SSI Unit

    Nos. of Handicraft Unit

    (i)

    (ii)

    (iii)

    (iv)

    (v)

    (vi)

    (vii)

    1

    Rani

    29,429.00

    2

    39

    56

     

    2

    Chayani

    28,610.00

    1

    30

    39

     

    3

    Rampur

    8,175.00

    4

    26

    44

     

    4

    Chaygaon

    49,963.00

    3

    28

    41

     

    5

    Boko

    74,998.00

    1

    23

    43

     

    6

    Bongaon

    54,585.00

    Nil

    21

    37

     

    7

    Chamaria

    91,630.00

    1

    19

    43

     

    8

    Goroimari

    16,760.00

    Nil

    15

    28

     

    9

    Hajo

    1,56,560.00

    9

    34

    73

     

    10

    Sualkuchi

    1,02,485.00

    4

    35

    77

     

    11

    Bezera

    86,190.00

    4

    43

    54

     

    12

    Bihdia Jajikona

    Nil

    1

    82

    69

     

    13

    Kamal pur

    1,09,637.00

    6

    78

    68

     

    14

    Rangia

    88,155.00

    5

    101

    66

     

    15

    Goreswar

    1,00,500.00

    3

    80

    64

     

    Total

    99,7,677.00

    44

    654

    802

     

     

     

     

     

     

     

    Statements showing the details position on implementation of different Industrial scheme by DICC, Kamrup, in the different areas of the District (2001-2005)

     

    Sl

    No

    Name of the

    Block

    30% SCIS

    Interest subsidy on W/C

    Power Subsidy

    D.G. Set subsidy

    Nos. of benefic

    iaries

    Amount

    Disbursed

    Nos. of benefic

    iaries

    Amount

    Disbursed

    Nos. of benefic

    iaries

    Amount

    Disbursed

    Nos. of benefic

    iaries

    Amount

    Disbursed

    1

    Rani

    Nil

    Nil

    2

    Nil

    1

    91,32

     

     

    2

    Chayani

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    3

    Rampur

    2

    60,000/-

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    4

    Chaygaon

    1

    5,000/-

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    5

    Boko

    2

    66,000/-

    Nil

    Nil

    2

    1,30,000/-

    1

    35,000/-

    6

    Bongaon

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    7

    Chamari

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    8

    Goroimari

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    9

    Hajo

    36

    7,81,168/-

    Nil

    Nil

    1

    9021/-

    Nil

    Nil

    10

    Sualkuchi

    9

    4,04,881/-

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    11

    Bezera

    Nil

    Nil

    5

    3,40,397/-

    1

    24,745/-

    4

    1,75,000/-

    12

    Bihdia Jajikona

    1

    10,290/-

    Nil

    Nil

    Nil

    Nil

    Nil

    Nil

    13

    Kamal pur

    Nil

    Nil

    Nil

    Nil

    2

    18,829/-

    Nil

    Nil

    14

    Rangia

    7

    1,68,168/-

    Nil

    Nil

    3

    5,40,390/-

    Nil

    Nil

    15

    Goreswar

    2

    1,36,816/-

    Nil

    Nil

    2

    67,646/-

    Nil

    Nil

    Total

    60

    16.32323

    7

    3.40397

    12

    9.6314

    5

    2.10

    EDUCATION DEPARTMENT

    Education

     

     

    Elementary Education

    PMGY

    The PMGY Scheme were also implemented through the Elementary Education Department. During 2001-02, an amount of Rs. 1.00 lakh each has been submitted against 66 nos of schools for construction of school buildings under PMGY. During 2002-03, an amount of Rs. 1.50 lakhs each has been submitted against 48 nos of schools for construction for school buildings under PMGY. During 2003-04, also an amount of Rs. 1.50 lakhs each has been submitted against 48 nos of schools. No fund was provided against the schemes during 2004-05.

     

    The details of schemes under Elementary Education Department during last four years w.e.f. 2001-02 are indicated below –

    Statements on achievement under Elementary Education Department

    w.e.f. 2001-02 of development departments

    Sl. No.

    Year

    Name of the scheme / programme

    Total fund involved (Rs. In lakhs)

    Total expenditure incurred (Rs. In lakhs)

    Physical progress (In percentage)

    Beneficiaries covered (Nos.)

    Remarks

    1

    2

    3

    4

    5

    6

    7

    8

    1

    2001-02

    1. Construction of school building under PMGY

    66.00

    66.00

    100

    66

     

    2. Distribution of Text Book

    Fund was utilized by the DEE

    -

    100

    All students of Ele. Edn.

     

    2

    2002-03

    1. Construction of school building under PMGY

    72.00

    72.00

    100

    48

     

    2. Distribution of Text Book

    Fund was utilized by the DEE

    -

    100

    All students of Ele. Edn.

     

    3

    2003-04

    1. Construction of school building under PMGY

    72.00

    72.00

    100

    48

     

    2. Distribution of Text Book

    Fund was utilized by the DEE

    -

    100

    All students of Ele. Edn.

     

    4

    2004-05

    1. Construction of school building under PMGY

    Nil

    Nil

    Nil

    Nil

     

    2. Distribution of Text Book

    Fund was utilized by the DEE

    -

    100

    All students of Ele. Edn.

     

     

     

     

     

    Rajib Gandhi Computer Literacy Programmed

     

              In Kamrup district, already 15 nos of schools were covered under RGCLP during 2003-2004 and 14 nos schools were covered during 2004-05. Another 12 nos of schools are propsed to be covered in the 3rd phase in Kamrup district for 2005-06 for which selection of schools have already been done.

              Lists of schools covered under RGCLP during the year 2003-2004, 2004-05 and 2005-06 are indicated below:-

     

              1. RGCLP-2003-04 (Phase-I)     2. RGCLP-2005-06 (Phase-III)           

    Sl.

    No

    Name of Schools

     

    Sl.

    No

    Name of Schools

    1

    Chagsari HS School

     

    1

    Nagarbera HS School

    2

    SBSKR HS School

     

    2

    Rangeswari Tupamari HS School

    3

    Dadama HS School

     

    3

    Puthimari HS School

    4

    Kamalpur HS School

     

    4

    Karara HS School

    5

    Jawaharjyoti HS School

     

    5

    Pachgaon HS School

    6

    Rangia Girl's HS School

     

    6

    Ramdia HS School

    7

    Kaurbaha Fakaruddin HS School

     

    7

    Halogaon HS School

    8

    RBHS & MP School

     

    8

    Khetri-Hardia HS School

    9

    Rampur HS School

     

    9

    Tulsibari Bahumukhi HS School

    10

    Chaygaon HS School

     

    10

    Borigog Hajo HS School

    11

    Majortop HS School

     

    11

    Rangia Madrassa HS School

    12

    Hekra HS School

     

    12

    Rangia HS School

    13

    Sontoli HS School

     

    13

    Amaranga Borihat HS School

    14

    Bezera HS School

     

    14

    Sualkuchi HS School

    15

    Dadara HS School

     

             

     

     

     

    3. RGCLP-2005-06 (Phase-III)

     

    Sl No

    Name of Schools

    1

    No-2 Jogipara LBSA HS School

    2

    Baramboi HS School

    3

    BAS Madrassa HS School

    4

    Dampur HS School

    5

    Dharapur HS School

    6

    Dhuhi Bala Madrassa HS School

    7

    PB Kaniha HS School

    8

    KB Deolkuchi HS School

    9

    Nowkata Milan HS School

    10

    Goreswar HS School

    11

    Bani Vidyapith HS School

    12

    Ramdia Girls HS School

    AGRICULTURE DEPARTMENT

    Achievement under

    “Agriculture Department”     

     

    1. Agriculture : (Blockwise Achievements)

              The Schemes like OPP, NPDP, ARIASP and KCC’s were implemented in 8 nos. of Development Blocks in the district, such as Hajo, Sualkuchi, Chayani Barduar, Rani, Chamaria, Goroimari, Bezera, and Rangia Development Blocks.

              Under OPP, demonstration of Sunflower, Mustard etc. have been done along with distribution of  Slacked lime, Garlic, Orange, Arecanut seeding, Mosombi, Coconut etc.

              Under NPDP, demonstration works of Gram, Lentil, Blackgram etc. have been done along with distribution of Minikits.

              Under ARIASP, seeds of different crops such as Pea, Mustard, Lentil were distributed among the farmers along with demonstration Programme of cashewnuts. Poly houses were also constructed for protection of plants.

              The achievements under KCC’s for the period from 2001-2002 to 2004-2005 are as follows:-

    Sl. No.

    Name of Dev. Blocks

    KCC’s Issued in different years

    2001-2002

    2002-2003

    2003-2004

    2004-2005

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    Hajo Development Block.

    ---

    ---

    ---

    ---

    2

    Sualkuchi Dev. Block

    ---

    280

    800

    950

    3

    Chayani Barduar Dev. Block.

    ---

    72

    172

    280

    4

    Rani Dev. Block

    ---

    125

    318

    384

    5

    Chamaria Dev. Block

    ---

    ---

    230

    510

    6

    Goroimari Dev. Block

    ---

    ---

    180

    240

    7

    Bezera Dev. Block

    ---

    ---

    148

    300

    8

    Rangia Dev. Blocks

    ---

    ---

    320

    550

    Total

    ---

    477

    2168

    3214

     

     

    The details of blockwise activities of Agriculture Department

     

    1) Agriculture: Blockwise achievement under different programmes are indicated below:-

     

    Hajo Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    i) 350 nos. of Sunflower demonstration.

    ii) 15 mt. of slaked lime was distributed.

    64 nos. of Minikit Mustard demonstration.

    ---

    ---

    NPDP

    ---

    Gram demons. 8 nos.

    Lentil demons. 5 nos.

    Black Gram demons.10 nos.

    Gram 5 nos.

    Lentil 5 nos.

    Mustard 10 nos.

    500 packets Rhizobium culture was distributed

     

    Sualkuchi Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    ---

    24 nos. of Minikit of Mustard.

    Garlic 25 nos.

    Orange 100 nos.

    Aracanut seeding 100 nos.

    Mosombi 50 nos.

    Coconut 50 nos.

    10 hector Mustard demonstration.

    NPDP

    40 nos. of Lentil demontration

    2 nos of Gram demonstration

    Nil

    Nil

    ARIASP

    Gerbera plants 6800 nos.

     Plastic rain shelter (Poly house) 5 nos.

    Pea=34 qtls.

    Mustard = 5 qtls.

    Lentil=19.50 qtls.

    Cashew nut graft=1000 nos.

    Nil

    KCC

    ---

    280 nos

    800 nos.

    950 nos.

     

    Chayani Barduar  Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

     

     

     

     

    NPDP

    Nil

    3 nos. of Black Gram demons.

     

     

    KCC

     

    72 nos

    172 nos.

    28 nos.

     

     

     

     

     

     

     

    Rani Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    ---

    ---

    1 Hect demons.

    2 nos.

    ---

    NPDP

    ---

    i) 3 nos. of Lentil demons.

    ii) 3 nos. of black gram seeds.

    i) Gram 12 nos. demons.

    ii) Pea 16 nos. demons.

    iii) Mustard 5 nos. demons.

    ---

    KCC

    ---

    125 nos.

    318 nos.

    384 nos.

    ARIASP

    ---

    18 nos. of Poly House.

    ---

    ---

     

     

     

     

     

    Chamaria Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    ---

    ---

    20 nos. of mustard minikit.

    1 no. 10 hectare mustard demons.

    NPDP

     

    Gram minikit 7 nos. at Sontali.

    3 nos. of Gram Minikit at Nagarbera

    Nil

    KCC

    ---

    ---

    230 nos.

    510 nos.

    ARIASP

    ---

    ---

    Char Dev.

    Pea seed  63 qtls.

    Mustard 40 qtls.

    Lentil 70.50 qtls.

    (Sontali & Tupamari)

    Nil

     

    Goroimari Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    NPDP

    ---

    ---

    Gram Demons. 3 nos.

    Lentil Demons. 2 nos.

    ---

    ARIASP

     

     

    Pea seeds 36 qtls.

    Mustard 6 qtls.

    Lentil 28.50 qtls.(Char Area)

     

    KCC

    ---

    ---

    180 nos.

    240 nos.

     

    Bezera Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    ---

     

    30 nos. of Mustard Demons. in Bezera AEO Circle

    10 Hectare Demons.

    1 no. at Bezera AEO circle

    NPDP

     

    Black Gram Demons. 7 nos.

     

     

    KCC

     

     

    148 nos.

    300 nos.

     

    Rangia Development Block:

     

    Programme

    2001-2002

    2002-2003

    2003-04

    2004-05

    OPP

    8 Mtrs. distributed among 200 nos. of farmers.

     

    40 nos. Minikit demonstration.

    ---

    NPDP

    ---

    Gram minikit 2 nos.

    Black Gram Minikit 2 nos.

    3 nos. of Gram Demonstration

    ---

    ARIASP

    ---

    ---

    1 no demons .Cashewnut.

    ---

    KCC

     

     

    320 nos.

    550 nos.

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Achievement under Technology Mission on Integrated Development of Horticulture:

     

    (Period 2001-2002 to 2004-2005)

     

    Sl. No.

    Name of Dev. Block

    Village Selected

    Community Tank

    Crop Slected

    Area Covered

    (Hectars)

    Fund Involved

    (Rs. In Lakhs)

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    1

    Rangia

    Dhulabari(Dhepargaon)

     

     Nayan Jyoti Samabai Samitee

    ---

     

    ---

    Tamato

     

    Flower

    10 Htrs.

     

    6 Htrs.

    0.945

     

    4.29

    2

    Kamalpur

    Moukuchi Maihati Satra

    ---

    Tube rose

    5 Htrs.

    3.25

    3

    Sualkuchi

     

    1=2001-02

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Achievements under different schemes

    in the district of Kamrup.

    Name of the Department : Agriculture, (Status for the district as a whole)

     

    Sl. No.

    Year

    Name of the Scheme

    Total Fund involved

    (Rs. In Lakhs)

    Total Expenditure

    Physical Progress

    Beneficiere covered

     

    Area Covered

     

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    (9)

    1

    2001-02

    NPDP

    Nil

    Nil

    Nil

    ---

    ---

     

    OPP

    N.A.

    Nil

    14.7 qtls. Sunflower seeds for demonstration.

    85 Nos.

     

     

    50 Htr.

    1 bigha demonstration at 100% subsidy.

    37 nos. of Hand sprayers at Rs. 800/ subsidy.

    37 Nos.

     

    Rs. 800/- subsidy per set.

    CRF

     

     

    Wheat seed 660 qtls.

    8250 Nos.

    660 Htr.

     

    Lentil 109 qtls.

    2725 Nos.

    315 Htr.

    Pea 30 qtls.

    750 Nos.

    60 Htr.

    Mustard 23.80 qtls.

    575 Nos.

    154 Htr.

    Paddy 25.20

    252 Nos.

    75 Htr.

    Paddy 5.00 qtls

    50 Nos.

     

    Total

    853 qtls.

    12602 Nos.

    1264 Htrs.

     

    2

    2002-03

    NPDP

    Nil

    Nil

    Black Gram 30 nos. 120 kg.

    30 Nos.

    4 Htr.

    1 bigha demonstration

    Demons. Seed

    Gram MKT 30 nos.

     

    30 nos.

     

    5 Htr.

    1 bigha demonstration

    CRF

    Nil

    Nil

    Paddy 232 qtls.

    2320 nos.

    580 Htr.

    CRF seeds are at 100% subsidy.

    G. Gram 100 qtls.

    2500 nos.

    333 Htr.

    B. Gram 435 qtls.

    110875 nos.

    1450 Htr.

    Wheat 669 qtls.

    8250 nos.

    670 Htr.

    Lentil 78 qtls.

    1950 nos.

    229 Htr.

    Mustard 55 qtls

    550 nos.

    366 Htr.

    Pea 27 qtls.

    675 nos.

    54 Htr.

    Maize 100 qtls.

    1666 nos.

    181 Htr.

    Paddy 97 qtls.

    970 nos.

    242 Htr.

    Total

    1793 qtls

    29756 nos.

    4105 Htr.

     

                       

     

     

    Sl. No.

    Year

    Name of the Scheme

    Total Fund involved (Rs. In Lakhs)

    Total

    Expenditure

    Physical Progress

    Beneficiere covered

     

    Area Covered

     

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    (9)

    3

    2002-03

    OPP

     

     

    Mustard 1000 kg.

    500 nos. demonstration.

     

    500 Nos.

     

    66 Htrs.

     

    CRF

    Nil

    Nil

    Paddy 118 qtls.

    1180 Nos.

    295 Htrs.

    All seeds were at 100% subsidy.

    Wheat 2366 qtls.

    29575 Nos.

    2366 Htrs.

    Maize 100 qtls.

    1666 Nos.

    222 Htrs.

    Pea 232 qtls.

    5800 Nos.

    464 Htrs.

    Mustard 144 qtls.

    3600 Nos.

    960 Htrs.

    Lentil 432 qtls.

    10800 Nos.

    1234 Htrs.

    B. Gram 300 qtls.

    7500 Nos.

    857 Htrs.

    Total

    3692 qtls.

    60161 Nos.

    6390 Htrs.

    NPDP

    Nill

    Nill

     

     

     

     

    4

    2003-04

    NPDP

    Nil

    Nil

    Gram 4.00 qtls.

    50 Nos.

    8.8 Htr.

    1 htr. Demons. each At 100% subsidy

     

    Lentil 2.00 qtls.

    50 Nos.

    6.6 Htr.

    Mustard 3.00 qtls.

    150 Nos.

    20 Htr.

    Pea 3.20 qtls.

    40 Nos.

    7.1 Htr.

    Total

    12.20 qtls.

    290 Nos.

    42. 5 Htr.

    OPP

    Nil

    Nil

    Mustard seed 2.00 qtls.

    20 nos. Demons. 1 htr.

    105 nos.

     

    20 Htr.

    1 htr. Demons. at 100% subsidy

    ARIASP

     

     

    Cashewnut demons.

    9 nos. 9000 nos. graft

     

     

    45 Htrs.

    5 htr. Size Demons. at 100% subsidy

    Char Development

     

     

    Pea 220 qtls

    5500 nos.

    440 Htrs.

    1 bigha Demons. to each farmer at 100% subsidy

    Mustard 58 qtls

    2900 nos.

    480 Htrs.

    Lentil 195 qtls

    4875 nos.

    650 Htrs.

    Total

    473 Qtls.

    13275 nos.

    1570 Htrs.

                       

     

     

     

    5

    2004-05

    OPP

     

     

    10 htrs. Mustard demons. 4 nos.

     

    310 Nos.

     

    40 htrs.

    At 100% subsidy

     

     

     

     

     

    CRF

     

     

    Wheat 4300 qtls.

    53750 Nos.

    4300 htrs.

    1 bigha seed issued to each beneficiary at 100% subsidy except wheat ½ bigha.

    Lentil 700 qtls.

    17500 Nos.

    2333 htrs.

    Pea 500 qtls.

    12500 Nos.

    1000 htrs.

    Mustard 50 qtls.

    2500 Nos.

    333 htrs.

    B. Gram 470 qtls.

    11750 Nos.

    1566 htrs.

    G.Gram 100 qtls.

    2500 Nos.

    333 htrs.

    Paddy 150 qtls.

    1500 Nos.

    375 htrs.

    Maize 70 qtls.

    1166 Nos.

    116 htrs.

    Total

    6340 qtls.

    1,03,166

    10356 htrs.

     

     

    SCCP SCHEME 2001-2002

     (District: Kamrup)

     

    Sl.

    No.

    Schemes

    Item

    Nos/ Quantity

    Nos. of Beneficiary

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    Agricultural Marketing Scheme

    Paddle thresher at 100% subsidy

    30 Nos.

    30 Nos.

     

    2

    Compact Area

    a) Knop Dack

    Sprayer 16 lit. at subsidise rate.

    70 nos.

    70 nos.

     

    b) Mustared demonstration at 100% subsidy.

    2.10 qtls.

    70 nos.

     

    c) Ahu Paddy Demonstration at 100% subsidy.

    6.0 qtls.

    69 nos.

     

     

     

    SCCP SCHEME 2003-2004

    (District: Kamrup)

     

    Sl.

    No.

    Schemes

    Item

    Nos./ Quantity

    Nos. of Beneficiary

    Remark

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    Integrated Agricultural Engineering Development

    Power tiller at subsidy of Rs. 50,000 each.

    2 nos.

    2 nos

     

    2

    Compact Area Development Scheme

    a) Ahu Paddy Demonstration 2 bigha

    (Input 100% subsidy)

    --

    146 nos.

     

    b) Mustard demonstration (Input 100% subsidy)

    --

    146 nos

     

    c) Hand sprayer (subsidy Rs. 1400.00 per sprayer)

    --

    146 nos.

     

    d) Paddy Weeder at (Subsidy of Rs. 350.00)

    --

    146 nos.

     

    3

    Agricultural Marketing

    Plastic crate at 100% subsidy

     

     

     

     

     

     

     

     

     

     

    SCCP SCHEME 2004-2005

    (District: Kamrup)

     

    Sl.

    No

    Schemes

    Item

    Nos./ Quantity

    Nos. of Beneficiary

    Remark

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    MMMA

    Auto Van (Subsiding Rs. 30,000 each

    2 nos.

    6 nos.

    Selection of beneficiaries is under process.

    2

    Ahu Paddy Demonstration

    100% Subsidy

    40 nos

    40 nos

     

     

    TSP SCHEME 2001-2002

    (District: Kamrup)

     

    Sl.

    No.

    Schemes

    Item

    Nos./ Quantity

    Nos. of Beneficiary

    Remark

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    Agricultural Marketing Scheme

    Paddy thresher at subsidise rate

    30 nos.

    30 nos.

     

    2

    Compact Area Dvelopment Scheme

    a) Knap Seck sprayer 16 lit. subsidise rate Rs.1495/-

    58 nos.

    58 nos

    b) Seed demonstration at 100% subsidy

    3 nos.

    3 nos.

     

    TSP SCHEME 2003-2004 (District: Kamrup)

     

    Sl.

    No

    Schemes

    Item

    Nos./ Quantity

    Nos. of Beneficiary

    Remark

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    Integrated Agricultural Engineering Development Scheme

    Power tiller at subsidy of Rs. 50,000 each.

    3 nos.

    3 nos

     

    2

    Compact Area Development Scheme

    a) Ahu Paddy Demonstration 100% subsidy

    148 nos

    148 nos.

     

    b) Mustard demonstration 100% subsidy

    148 nos.

    148 ns.

     

    c) Hand sprayer at subsidized rate of Rs. 400/- each

    148 nos.

    148 nos.

     

    d) Paddy Weeder at Subsidised rate of Rs. 350.00 each.

    148 nos.

    146 nos.

     

    3

    Agricultural Marketing

    Plastic crate at 100% subsidy

    468 nos.

    116 nos.

     

     

     

     

    TSP SCHEME 2004-2005 (District: Kamrup)

     

    Sl.

    No

    Schemes

    Item

    Nos./ Quantity

    Nos. of Beneficiary

    Remark

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    1

    MMMA

    Auto Van at Subsidy of Rs. 30,000 each

    2 nos.

    8 nos.

    Selection of beneficiaries is under process.

    2

    Agricultural Engineering Dev. Scheme

    Power Tiller, subsidy of Rs. 50,000/- each

    4 nos.

    4 nos.

     

    3

    Agricultural Marketing Scheme

    Cycle Thela, Subsidy of Rs. 35,000/- each

    8 nos.

    8 nos.

     

    4

    Ahu Paddy Demonstration

    100% subsidy

    294 nos.

    294 nos.

     

    SOIL CONSERVATION DEPARTMENT

    Soil Conservation Department

     

    During the period from 2001-02 to 2004-05, seven numbers of schemes were taken up by the South Bank Soil Conservation Division, Guwahati.

    During 2001-02, Bartari LDP phase-II was taken up with total fund investment of Rs. 35,000/- and 15 numbers of families were benefited with area coverage of 20 hectares.

    During 2002-03, two Land Development Projetc namely; Chamaria LDP and Namkhajar LDPs were taken up with total cost of Rs. 20,000/- each. Total areas covered by the projects were 15 hectares each and total numbers of families benefited were 15 numbers and 18 numbers respectively.

    During 2003-04, two Land Developments at Satpakhali and Dhantola and one Central Nursery at Naranga (Aff.) were taken up with total fund involvement of Rs. 40,000/-, Rs. 25,000/- and Rs. 15,000/- respectively. Total 18 numbers of families were benefited through the Land Development Projects. During the year, 1000 numbers of poly pots and 30 numbers of beds were raised in the Central Nursery.

    During 2004-05, Chakabaha L.D.P. was taken up and completed with total fund involvement of Rs. 50,000/-. Total families benefited were 30 numbers through coverage of 50 hectares of area.

    The details of schematic achievements are indicated below –

    Statements of Achievements under South Bank Soil Conservation Division, Guwahati-5 w.e.f. 2001-02 to 2004-05

    Sl. No.

    Year

    Name of the scheme / project / programme

    Total fund involved (Rs. In lakhs)

    Total expenditure incurred (Rs.)

    Physical progress

    Beneficiaries covered

    ( nos. of Femily)

    Area covered (In Ha.)

    1

    2

    3

    4

    5

    6

    7

    8

    I

    2001-02

    Bartari L.D.P., Phase-II

    35,000.00

    35,000.00

    20 ha.

    15

    20

    II

    2002-03

    Chamaria L.D.P.

    20,000.00

    20,000.00

    15 ha.

    15

    15

    III

    2002-03

    Namkhajar L.D.P.

    20,000.00

    20,000.00

    15 ha.

    18

    15

    IV

    2003-04

    Satphakhali L.D.P.

    40,000.00

    40,000.00

    30 ha.

    100

    30

    V

    2003-04

    Dhantola L.D.P.

    25,000.00

    25,000.00

    30 ha.

    80

    30

    VI

    2003-04

    Central Nursery at Naranga (Aff.)

    15,000.00

    15,000.00

    1000 nos poly pot

    30

    30

    VII

    2004-05

    Chabaha L.D.P.

    50,000.00

    50,000.00

    50 ha.

    30

    50

    VETERINARY DEPARTMENT

    Animal Husbandry and Veterinary

     

     

              Total funds received under Animal Husbandry and Veterinary Department covering 14 nos. of Developmet Blocks from the year 2001-02 to 2004-05 were Rs. 20.932 lakhs and the entire amounts were spent for implementation of the scheme of ARIASP/LDC and DCP (General). During the period no fund was received under Swarnadhenu Scheme.

     

              The details of block wise achievements under different Schemes w.e.f. 2001-02 to 2004-05 are indicated below: -

     

    Statements of Blockwise achievements under different Schemes w.e.f. 2001-02 to 2004-05.

     

    Name of the Deparment:          Animal Husbandry and Veterinary

     

    1. Hajo Dev. Block.

     

    Year

    Name of Scheme

    Fund received

    Total Exp.

    Physical Achievement

    Beneficiary covered

    Area Covered

    Reason for Shortfall

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.64

    064

    100%

    16,000

    Block area

    No

    2003-04

    Do

    1.17

    1.17

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.81

    1.81

     

     

     

     

     

    2. Sualkuchi Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.32

    0.32

    100%

    8000

    Block area

    No

    2003-04

    Do

    0.84

     

    0.84

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.16

    1.16

     

     

     

     

     

    3. Rani Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.16

    0.16

    100%

    4000

    Block area

    No

    2003-04

    Do

    0.448

     

    0.448

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

     

    --

    --

    --

    --

    Total

    0.608

    0.608

     

     

     

     

     

    4. Chayani Barduar Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.55

    0.55

    100%

    10,000

    Block area

    No

    2003-04

    Do

    2.20

     

    2.20

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    2.75

    2.75

     

     

     

     

     

    5. Rampur Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.16

    0.16

    100%

    4,000

    Block area

    No

    2003-04

    Do

    0.88

     

    0.88

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.04

    1.04

     

     

     

     

     

    6. Chaygaon Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.55

    0.55

    100%

    10,000

    Block area

    No

    2003-04

    Do

    0.832

     

    0.832

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.382

    1.382

     

     

     

     

     

    7.-8. Boko Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.47

    0.47

    100%

    8,000

    Block area

    No

    2003-04

    Do

    0.674

     

    0.674

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.144

    1.144

     

     

     

     

     

    9. Chamaria Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.24

    0.24

    100%

    4,000

    Block area

    No

    2003-04

    Do

    0.92

     

    0.92

    100%

    Entire Population

    Do

    No

    2004-05

    DCP(General)

    2.00

    2.00

    100%

    Do

    Do

    No

    Total

    3.16

    3.16

     

     

     

     

     

     

    10. Goroimari Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.08

    0.08

    100%

    2,000

    Block area

    No

    2003-04

    Do

    0.024

     

    0.024

     

    100%

    Entire Population

    Do

    No

    2004-05

    DCP(Gen)

    2.00

    2.00

    --

    --

    --

    --

    Total

    2.32

    2.32

     

     

     

     

     

    11. Bezera Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.63

    0.63

    100%

    12,000

    Block area

    No

    2003-04

    Do

    1.236

     

    1.236

     

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.866

    1.866

     

     

     

     

     

    12. Kamalpur Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.39

    0.39

    100%

    6,000

    Block area

    No

    2003-04

    Do

    0.724

     

    0.724

     

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    1.114

    1.114

     

     

     

     

     

     

     

     

     

     

    13. Rangia Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.63

    0.63

    100%

    12,000

    Block area

    No

    2003-04

    Do

    0.494

     

    0.494

     

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    2.124

    2.124

     

     

     

     

     

    14. Bihdia Jajikona Dev. Block.

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    2001-02

    Swarnadhenu

    --

    --

    --

    --

    --

    --

    2002-03

    ARIASP/LDC

    0.23

    0.23

    100%

    2,000

    Block area

    No

    2003-04

    Do

    0.224

     

    0.224

     

    100%

    Entire Population

    Do

    No

    2004-05

    Do

    --

    --

    --

    --

    --

    --

    Total

    0.454

    0.454

     

     

     

     

     

    N.B. No programme for Goreswar Dev. Block.                  

    FISHERIES DEPARTMENT

    Fisheries Department.

     

    The following are the important schemes under Fisheries Department.

              i) Development of Farmers pond under ARIASP.

              ii) Development of Community Tank under ARIASP

              iii) Paddy cum Fish Culture, Under ARIASP

              iv) Pig cum Fish Culture, Under ARIASP

              v) Intensive Fish Culture with Horticulture.

    i) Development of Farmers Pond:-     

     

              Under this scheme 126 nos. of beneficiaries have been covered with a total project cost of Rs. 13.804 lakhs. The water areas covered were 15.01 hectors. Total 15 nos. of Blocks have been covered under this scheme.

     

    ii) Development of Community Tank:

     

              Under the scheme of "Development of Community Tank" 34 nos. of beneficiaries have been covered with a total project cost of Rs. 25.365 lakhs. The total water areas covered were 27.60 hectares. The entire 15 nos. of Blocks have been covered under the scheme.

     

    iii) Paddy cum Fish Culture:

     

              Under the scheme of " Paddy cum Fish Culture" four nos of Development Blocks have been covered, namely Kamalpur, Hajo, Chayani Barduar and Bezera Dev. Bloc with one no. of beneficiary each. Total paddy area covered was 1(one) hectare with a total project cost of Rs. 0.767 lakhs.

             

    iv) Pig cum Fish Culture:

     

              Under the scheme of "Pig cum Fish Culture" only Boko Development Block was covered with one number of beneficiary with a total project cost of Rs. 39,600/- only.

     

    v) Intensive Fish Culture with Horticulture:

     

              Under the scheme of "Intensive Fish Culture with Horticulture" five nos. of Development Blocks have been covered, namely Chaygaon, Kamalpur, Rangia, Goreswar and Hajo. Total nos. of beneficiaries covered were 8 nos. with a total cost of Rs. 1.148 lakhs and area coverage of 1.48 hectares.

    Achievements under Fisheries Department (Blockwise Performance)

    Name of the SCHEME: Development of farmers pond UNDER AARIASP

    (2001-2002)

     

    S. No

    Name of Dev. Block

    Total nos. of Beneficiaries

    (in nos.)

    Total cost of the Project

    (Rs. In lakhs)

    Total World Bank Share

    (Rs. In lakhs)

    Farmers Share on Capital Cost

    Water area in Hectars

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    1

    Rani Dev. Block

    2

    0.46

    0.40

    0.06

    0.50

     

    2

    Rampur Dev. Block

    5

    0.89

    0.79

    0.10

    0.97

     

    3

    Chayani Barduar D. Block

    2

    0.35

    0.31

    0.04

    0.38

     

    4

    Chaygaon Dev. Block

    3

    0.276

    0.24

    0.036

    0.30

     

    5

    Chamaria Dev. Block

    6

    0.919

    0.816

    0.103

    1.00

     

    6

    Bongaon Dev. Block

    3

    0.358

    0.318

    0.04

    0.39

     

    7

    Boko Dev. Block

    5

    0.404

    0.359

    0.045

    0.44

     

    8

    Goroimari Dev. Block

    5

    0.625

    0.554

    0.071

    0.68

     

    9

    Bihdia Jajikona D. Block

    10

    1.389

    1.224

    0.165

    1.50

     

    10

    Bezera Dev. Block

    8

    0.90

    0.799

    0.101

    0.98

     

    11

    Kamalpur Dev. Block

    13

    1.26

    1.117

    0.143

    1.37

     

    12

    Goreswar Dev. Block

    8

    0.625

    0.554

    0.071

    0.68

     

    13

    Rangia Dev. Block

    43

    3.154

    2.797

    0.357

    3.43

     

    14

    Sualkuchi Dev. Block

    2

    0.294

    0.261

    0.033

    0.32

     

    15

    Hajo Dev. Block

    11

    1.90

    1.689

    0.211

    2.07

     

    Total

    126

    13.804

    12.228

    1.576

    15.01

     

     

    Achievements under Fisheries Department

    (Blockwise Performance)

    Name of the scheme : Paddy cum fish culture, Under 

    ariasp (2001-2002)

    S. No

    Name of Dev. Block

    Total nos. of Beneficiaries

    (in nos.)

    Total cost of the Project

    (Rs. In lakhs)

    Total World Bank Share

    (Rs. in lakhs)

    Farmers Share on Capital Cost

    Water area in Hectars

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    1

    Rani Dev. Block

    1

    0.459

    0.408

    0.051

    0.50

     

    2

    Rampur Dev. Block

    1

    0.459

    0.408

    0.051

    0.50

     

    3

    Chaygaon Dev. Block

    1

    0.735

    0.652

    0.083

    0.80

     

    4

    Chamaria Dev. Block

    1

    1.838

    1.632

    0.206

    2.00

     

    5

    Hajo Dev. Block

    4

    5.699

    5.059

    0.64

    6.20

     

    6

    Bihdia Jajikona D. Block

    6

    2.665

    2.366

    0.299

    2.90

     

    7

    Goroimari Dev. Block

    1

    2.279

    2.04

    0.257

    2.50

     

    8

    Boko Dev. Block

    1

    0.919

    0.816

    0.103

    1.00

     

    9

    Bezera Dev. Block

    4

    1.93

    1.713

    0.217

    2.10

     

    10

    Kamalpur Dev. Block

    4

    1.609

    1.428

    0.181

    1.75

     

    11

    Goreswar Dev. Block

    2

    2.482

    2.203

    0.279

    2.70

     

    12

    Rangia Dev. Block

    7

    3.906

    3.468

    0.438

    4.25

     

    13

    Sualkuchi Dev. Block

    1

    0.367

    0.326

    0.041

    0.40

     

    14

    Chayani Barduar D. Block

    Nil

    Nil

    Nil

    Nil

    Nil

     

    15

    Bongaon Dev. Block

    Nil

    Nil

    Nil

    Nil

    Nil

     

    Total

    34

    25.365

     

    22.519

    2.846

    27.60

     

     

    Achievements under Fisheries Department

    (Blockwise Performance)

    Name of the SCHEME: Development of Community Tank,

    Under  ariasp (2001-2002)

     

    S. No

    Name of Dev. Block

    Total nos. of Beneficiaries

    (in nos.)

    Water  area

    (in hecters)

    Total Cost

    (Rs. In lakhs)

    World Bank's share

    (Rs. In lakhs)

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    1

    Kamalpur Dev. Block

    1

    0.20

    0.15,350

    0.15,350

    Schemes are not taken up in other Development blocks

    2

    Hajo Dev. Block

    1

    0.25

    0.19,188

    0.19,188

    3

    Chayani Barduar Dev. Block

    1

    0.27

    0.20,723

    0.20,723

    4

    Bezera Dev. Block

    1

    0.28

    0.21,490

    0.21490

    District Total

    4

    1.00

    0.76,751

    0.76,751

     

     

    Achievements under Fisheries Department

    (Blockwise Performance)

    Name of the SCHEME: pig Cum Fish Culture, Under 

    ariasp (2001-2002)

     

    S. No

    Name of Dev. Block

    Total nos. of Beneficiaries

    (in nos.)

    Water area

    (in hecters)

    Total Cost

    (Rs. In lakhs)

    World Bank's share

    (Rs. In lakhs)

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    1

    Boko

    1

    0.30

    0.39,600

    0.39,600

    Schemes are not taken up in other Development blocks

    District Total

    1

    0.30

    0.39,600

    0.39,600

     

    Achievements under Fisheries Department

     (Blockwise Performance)

    Name of the SCHEME: intensive fish culture with horticulture,

    Under  ariasp (2002-2003)

     

    S. No

    Name of Dev. Block

    Total nos. of

    Beneficiaries

    (in nos.)

    Paddy Plot area

    (in hecters)

    Total Cost

    (Rs. In lakhs)

    World Bank's share

    (Rs. In lakhs)

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    1

    Chaygaon Dev. Block

    1

    0.13

    0.10,088

    0.10,088

    Shares are not taken up in other Development blocks

    2

    Kamalpur Dev. Block

    2

    0.40

    0.31,040

    0.31,040

    3

    Rangia Dev. Block

    3

    0.55

    0.42,680

    0.42,680

    4

    Goreswar Dev. Block

    1

    0.25

    0.19,400

    0.19,400

    5

    Hajo

    1

    0.15

    0.11,640

    0.11,640

     

    District Total

    8

    1.48

    1.14,848

    1.14,848

     

     

    HANDLOOM & TEXTILE DEPARTMENT

    Handloom and Textile

     

    1. Project Package Scheme: Total fund involved under project package scheme during 2001-02 was Rs. 36.20 lakhs, out of which the entire amount of Rs. 36.20 lakhs was spent and 100 percent physical achievement was made.

     

    Under Project Package Scheme during 2002-03, the total fund involvement was Rs. 31.07 lakhs and the entire amount spent with physical progress of 100 %.

     

    NO fund was provided under Project Package Scheme during 2003-04 and 2004-05.

     

    1. Construction of Rural Workshed cum Housing: Under construction of Rural Workshed cum Housing, an amount of Rs. 4.27 lakhs was spent during 2001-02 and 100 per cent physical achievement was made.

     

    Under this scheme, an amount of Rs. 9.80 lakhs was provided for 2003-04 and the entire amount was spent with 100 per cent physical achievement.

     

    No fund was provided under the scheme during 2002-03 and 2004-05.

     

    1. Supply of Fly-Shuttle Sley and Accessories with yarn:

     

    Under this scheme, an amount of Rs. 0.85 lakhs was spent during 2002-03 and 100 per cent physical achievement was made.

     

    During 2003-04, an amount of Rs. 4.825 lakhs was spent under the scheme with 100 per cent physical achievement.

     

    No fund was provided for 2001-02 and 2004-05.

     

    1. DEEN DAYAL HATH KARGHA PROTSAHAN YOJANA

     

    Under this scheme, an amount of Rs. 33.60 lakhs was provided during 2003-04 and the entire amount was spent with 100 per cent physical achievement.

     

    During 2004-05 also an amount of Rs. 33.60 lakhs was provided under the scheme and the entire amount was utilized with 100% physical achievement.

     

    1. Health Package Scheme: Under Health Package Scheme, an amount of Rs. 3.0275 lakhs was spent in 2002-03 and an amount of Rs. 1.114 lakhs was spent in 2004-05.

     

    No fund was provided during 2001-02 and 2003-04.

     

     

     

     

    Statement on achievement under different schemes implemented by

    Assistant Director,

    Handloom and Textiles Department, Kamrup

    w.e.f. 2001-02 to 2004-05

     

    1. Name of Department: Handloom and Textiles, Kamrup
    2. District: Kamrup

     

    Sl. No.

    Year

    Name of scheme/ programme

    Total fund involved (Rs. In lakhs)

    Total expenditure incurred

    (Rs. In lakhs)

    Physical progress (In %)

    Benefi-ciaries covered (Nos.)

    Area covered  (Operational)

    Reason for shortfall if any

    Remarks

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

     

    2001-02

    1.  Project Package Scheme

    36.20

    36.20

    100

    500

    i) Bezartari

    Nil

    i) Implemented by Kasturba Gramin Bayan S.S.Ltd

    ii) Lampara

     

    ii) Lampara Janajati B.K.S.S Ltd.

    iii) Jiakur

     

    iii) Jiakur Resham S.S. Ltd.

    iv) Boromboi

     

    iv) Paschim Guwahati Utpadan S.S. Ltd.

    v) Soalkuchi

     

    v) The Assam Co-op. Silk House Ltd.

    2. Construction of Rural Workshed cum Housing

    4.27

    4.27

    100

    61

    i) Baihata Chariali

     

    i) Under Trimurthy B.K.S.S. Ltd.

    ii) Salpara

     

    ii) Salpara M.B.K.S.S. Ltd.

    iii) Batarhat

     

    iii) Monorama BKSS Ltd

    iv) Rajapara

     

    iv) Saikata Anchalik Janajati BSS Ltd.

    v) North Guwahati

     

    v) Uttar Guwahati Aswaklanta BSS Ltd.

    vi) Gumoria

     

    vi) Gumoria BSS Ltd., Hokora

    vii) Jiakur

     

    vii) Jiakur BKSS Ltd.

    viii) Bongra

     

    viii) Last Gate Anchalik Unnayan BKSS Ltd

    ix) Parley

     

    ix) Sri Sri Niranjan BKSS Ltd.

    x) Soalkuchi

     

    x) Tilakchan Pahar Udiyaman BSS Ltd.

     

    2002-03

    1. Project Package Scheme

    31.07

    31.07

    100

    500

    i) Borka

     

    i) Implemented by Borka Mohila BKSS Ltd.

    ii) Soalkuchi

     

    ii) Assam Samabai Resham Pratisthan Ltd.

    iii) Rajabazar

     

    iii) Rajabazar BKSS Ltd.

    iv) Kharbhanga

     

    iv) Kharbhanga  Mohila BKSS Ltd.

    v) Mirza

     

    v) Mirza Bishnupur MBKSS Ltd.

     

    2002-03

    2. Supply of Fly-Shuttle Sley and accessories with yarn (D.C.P.)

    0.85

    0.85

    100

    34

    All Block area

    --

    --

    3. Health Package Scheme

    3.0275

    3.0275

    100

    525

    Do

    --

    --

     

    2003-04

    1. Deen Dayal Hathkargha Protsahan Yojana

    33.60

    33.60

    100

    300

    i) Soal kuchi

     

    i) The Assam Co-op. Silk Huse Ltd.

    ii) Bayan Sahayaika SS Ltrd.

    iii) Soalkuchi Resham SS Ltd.

    iv) Pragjyoti Industrial Weaving Co-op. Ltd.

    ii) Baranbori

     

    v) Pachim Guwahati Utpadan SS Ltd.

    iii) Bezartari

     

    vi) Kasturba Gramin Bayan SS Ltd.

    2. Supply of Fly-Shuttle Sley and accessories with yarn (D.C.P.)

    4.825

    4.825

    100

    143

    All Block Area

    --

    --

    3. Construction of Rural Workshed cum Housing

    9.80

    9.80

    100

    140

    All Block Area

    --

    --

     

    2004-05

    1. Deen Dayal Hathkargha Protsahan Yojana

    33.60

    33.60

    100

    300

    i) Saru-Agchia

    --

    i) Borzhar Saru Agachia Prathamic BKSS Lts.

    ii) Balaparaq

     

    ii) Balapara B.K.SS Ltd.

    iii) Jiakur

     

    iii) Jiakur Mohila BKSS Ltd.

    iv) Borka

     

    iv) Borka Mohila BKSS Ltd.

    v) Dhopatari

     

    v) Lakhimi weaving co-op. SS Ltd.

    vi) Soalkuchi

     

    vi) Assam Samabari Resham Prathisthan

    2. Health Package Scheme

    1.114

    1.114

    100

    211

    All block area

    --

    --

     

    D R D A, KAMRUP

    District Rural Development Agency, Kamrup (DRDA)

     

              The important Schemes taken up by the DRDA are SGSY, SGRY, EAS, JGSY, IAY, PMGY and IWDP etc. All the schemes have been implemented through the Development blocks in the district.

     

              Total fund involved under SGSY has been incurred from Rs. 250.52 lakhs in 2001-02 to Rs. 385.59 lakhs in 2002-03 and to Rs. 655.49 lakhs in 2003-04. But the total fund involved under SGSY remained at Rs. 582.61 lakhs in 2004-05. Total expenditure incurred under SGSY were 191.50 lakhs in 2001-02, Rs. 331.60 lakhs in 2002-03, Rs. 642.38 lakhs in 2003-04 and Rs. 532.61 lakhs in 2004-05. Fund involvements under SGRY were comparatively higher with Rs. 1997.81 lakhs in 2002-03, Rs. 2378.66 lakhs in 2003-04 and Rs. 1646.31 lakhs in 2004-05. Total expenditures under SGRY stood at Rs. 1378.49 lakhs in 2004-05. Fund involvements under IAY were Rs. 901.31 lakhs in 2001-02, Rs. 827.28 lakhs in 2002-03, Rs. 909.74 lakhs in 2003-04 and Rs. 1553.92 lakhs in 2004-05. Total expenditure under IAY stood at Rs. 880.49 lakhs in 2001-02, Rs. 637.00 lakhs in 2002-03, Rs. 855.15 lakhs in 2003-04 and Rs. 1490.71 lakhs in 2004-05. 

     

              The status of different schemes under DRDA, Kamrup is indicated below –

     

     

     

     

     

     

     

     

     

    Achievements under District Rural Development Agency, Kamrup during last four years w.e.f. 2001-2002.

     

    Sl No.

    Year

    Name of scheme/ programme

    Total fund involved (Rs. In lakhs)

    Total expenditure incurred (Rs. In lakhs)

    Physical progress (In %)

    Beneficiaries covered (In nos.)

    Area covered (In acre)

    Reasons for shortfall if any

    Remarks

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    1

    2001-02

    1. SGSY

    250.52

    191.50

    74

    4829

    Programme covered entire block area

     

     

    2. EAS

    715.80

    308.21

    41

    -

     

     

    3. JGSY

    747.44

    225.60

    29

    -

    Due to late receipt of fund form GOI

     

    4. IAY

    901.31

    880.49

    94

    9239

     

     

    5. PMGY

    219.20

    102.21

    45

    613

    -do-

     

     

     

     

     

     

     

     

     

    3yrs. Programme

     

    2

    2202-03

    1. SGSY

    385.59

    331.60

    86

    10470

    Programme covered entire block area

     

    6134 ha.

     

     

    2. SGRY

    1997.81

    1378.49

    69

    3359

     

     

    3. IAY

    827.28

    637.00

    77

    910

     

     

    4. PMGY

    288.70

    282.93

    98

    -

     

     

    5. IWDP

    56.61

    55.48

    98

    -

     

     

     

     

     

     

     

     

     

     

    3yrs. Programme

     

    3

    2003-04

    1. SGSY

    655.49

    642.38

    98

    18976

    Programme covered entire block area

     

    12134 ha.

     

     

    2. SGRY

    2378.66

    2117.00

    89

    4500

     

     

    3. IAY

    909.74

    855.15

    94

    967

     

     

    4. PMGY

    322.20

    138.55

    43

    -

     

     

    5. IWDP

    213.90

    132.11

    62

    -

     

     

     

     

     

     

     

     

     

     

    3yrs. Programme

     

    4

    2004-05

    1. SGSY

    582.61

    532.61

    91

    17495

    Programme covered entire block area

     

    23451 ha.

     

     

    2. SGRY

    1646.31

    1543.10

    94

    -

     

     

    3. IAY

    1553.92

    1490.71

    96

    8347

     

     

    4. PMGY

    446.38

    425.25

    95

    4944

     

     

    5. IWDP

    277.98

    230.32

    83

    -

     

     

     

    Achievement under iay during the period of last four years

    w.e.f. 2001-02

              The Indira Awas Yojana (IAY) was launched by the Ministry of Rural Development Department, Govt. of India of India in the year 1995-96. Since then the DRDA, Kamrup has been implementing the programme on receipt of fund from Govt. of India and Govt. of Assam.

              Since, 2001-2002, 12,334 house were constructed under IAY(New) and 6464 IAY (Upgradation) houses were constructed up to March'2005.

              The enclosed statement indicates Blockwise Achievement under IAY(New) and IAY (Upgradation) houses constructed during last four years w.e.f. 2001-02.

     

    Sl. No.

    Name of Dev. Block

    Year

    IAY(New)

    IAY(UG)

    Remarks

    1

    2

    3

    4

    5

    6

    1

    Rani

    2001-02

    121

    61

     

    2002-03

    138

    73

     

    2003-04

    204

    111

     

    2004-05

    178

    66

     

    2

    Chayani Barduar

    2001-02

    166

    82

     

    2002-03

    212

    112

     

    2003-04

    310

    170

     

    2004-05

    281

    135

     

    3

    Rampur

    2001-02

    151

    75

     

    2002-03

    129

    67

     

    2003-04

    193

    104

     

    2004-05

    165

    80

     

    4

    Sualkuchi

    2001-02

    121

    60

     

    2002-03

    114

    59

     

    2003-04

    153

    84

     

    2004-05

    135

    66

     

    5

    Goroimari

    2001-02

    121

    61

     

    2002-03

    90

    45

     

    2003-04

    132

    72

     

    2004-05

    110

    52

     

    6

    Chayagaon

    2001-02

    105

    53

     

    2002-03

    151

    79

     

    2003-04

    222

    122

     

    2004-05

    203

    99

     

    7

    Bongaon

    2001-02

    61

    31

     

    2002-03

    99

    79

     

    2003-04

    147

    122

     

    2004-05

    136

    99

     

    8

    Boko

    2001-02

    169

    31

     

    2002-03

    301

    52

     

    2003-04

    443

    79

     

    2004-05

    403

    66

     

    9

    Bihdia Jagikona

    2001-02

    179

    99

     

    2002-03

    152

    80

     

    2003-04

    222

    122

     

    2004-05

    193

    95

     

     

    10

    Kamalpur

    2001-02

    182

    91

     

     

     

    2002-03

    107

    55

     

     

     

    2003-04

    156

    88

     

     

     

    2004-05

    133

    68

     

     

     

    11

    Bezera

    2001-02

    103

    53

     

     

     

    2002-03

    120

    64

     

     

     

    2003-04

    176

    97

     

     

     

    2004-05

    153

    77

     

     

     

    12

    Rangia

    2001-02

    304

    151

     

     

     

    2002-03

    250

    135

     

     

     

    2003-04

    380

    207

     

     

     

    2004-05

    330

    163

     

     

     

    13

    Goreswar

    2001-02

    182

    91

     

     

     

    2002-03

    305

    160

     

     

     

    2003-04

    449

    246

     

     

     

    2004-05

    406

    200

     

     

     

    14

    Hajo

    2001-02

    241

    121

     

     

     

    2002-03

    243

    127

     

     

     

    2003-04

    356

    195

     

     

     

    2004-05

    308

    151

     

     

     

    15

    Chamaria

    2001-02

    228

    113

     

     

     

    2002-03

    211

    110

     

     

     

    2003-04

    311

    189

     

     

     

    2004-05

    266

    131

     

     

     

    Total

    12334

    6464

     

     

                     

     

     

     

     

     

     

    11.    Achievement Under SGRY.

              Swampoorna Gramin Rozgar Yojana (SGRY) was launched in the year 2002-03 by the Ministry of Rural Development, Govt. of India by merging the two earlier programme i.e. EAS & JGSY. SGRY has two Streams, Stream-I & Stream -II. Under the SGRY Stream -I, the funds received from the GOI and State Govt. was distributed among Zila Parishad and Anchalik Panchayat in the ratio of 40:60 and the fund received under SGRY-II was entirely distributed among the GPs as per the population pattern.

              In the year 2004-05, the Govt. of India again amalgamated both the stream into one programme i.e. SGRY. The fund received from the Govt. of India and State Govt. is distributed to the PRIs, ZP, AP, and G.P. in the ratio of 20:30:50. Since 2002-03 the entire amount received from the Govt. of India and State Govt. was released among the PRIs without keeping any amount in the DRDA, Kamrup. No works were executed by the DRDA, Kamrup except monitoring of the Schemes of various programmes.

              The scheme executed by different blocks under SGRY since 2002-03 and under EAS, JGSY during the year 2001-02 are indicated in the enclosed statement.

    Sl. No

    Name of Dev. Block

    Programme

    Year

    Item

    Total

    Road

    (in nos.)

    Building

    (in nos.)

    IBS

    (in nos.)

    Others

    (in nos.)

    1

    2

    3

    4

    5

    6

    7

    8

    9

    1

    Rani

    EAS

    2001-02

    40

    1

    -

    30

    71

    JGSY

    2001-02

    46

    25

    5

    61

    137

    SGRY

    2002-03

    22

    16

    38

    24

    100

    SGRY

    2003-04

    44

    18

    39

    50

    151

    SGRY

    2004-05

    72

    13

    106

    27

    218

    2

    Chayani Barduar

    EAS

    2001-02

    54

    2

    -

    31

    87

    JGSY

    2001-02

    33

    -

    9

    10

    52

    SGRY

    2002-03

    58

    27

    22

    142

    249

    SGRY

    2003-04

    82

    16

    76

    115

    289

    SGRY

    2004-05

    21

    9

    95

    51

    176

    3

    Rampur

    EAS

    2001-02

    23

    1

    -

    62

    86

    JGSY

    2001-02

    96

    -

    5

    22

    123

    SGRY

    2002-03

    84

    26

    25

    118

    253

    SGRY

    2003-04

    102

    30

    31

    50

    213

    SGRY

    2004-05

    42

    15

    20

    137

    214

    4

    Chaygaon

    EAS

    2001-02

    36

    1

    -

    15

    52

    JGSY

    2001-02

    33

    2

    62

    30

    127

    SGRY

    2002-03

    28

    14

    21

    28

    91

    SGRY

    2003-04

    76

    26

    66

    57

    222

    SGRY

    2004-05

    29

    63

    38

    44

    147

    5

    Goroimari

    EAS

    2001-02

    25

    7

    -

    41

    73

    JGSY

    2001-02

    43

    3

    62

    23

    141

    SGRY

    2002-03

    114

    34

    16

    92

    256

    SGRY

    2003-04

    58

    15

    8

    37

    118

    SGRY

    2004-05

    110

    50

    38

    23

    213

    6

    Bongaon

    EAS

    2001-02

    19

    5

    -

    26

    50

    JGSY

    2001-02

    45

    1

    14

    3

    63

    SGRY

    2002-03

    60

    22

    56

    40

    183

    SGRY

    2003-04

    64

    8

    58

    28

    178

    SGRY

    2004-05

    77

    13

    34

    94

    218

    7

    Boko

    EAS

    2001-02

    59

    14

    -

    29

    102

    JGSY

    2001-02

    32

    11

    12

    5

    55

    SGRY

    2002-03

    92

    54

    75

    36

    257

    SGRY

    2003-04

    95

    24

    98

    77

    294

    SGRY

    2004-05

    16

    17

    93

    25

    151

    8

    Chamaria

    EAS

    2001-02

    70

    18

    -

    20

    108

    JGSY

    2001-02

    64

    13

    14

    21

    112

    SGRY

    2002-03

    148

    30

    92

    65

    335

    SGRY

    2003-04

    98

    29

    43

    64

    234

    SGRY

    2004-05

    110

    73

    30

    23

    263

    9

    Sualkuchi

    EAS

    2001-02

    11

    13

    -

    20

    44

    JGSY

    2001-02

    3

    7

    21

    10

    41

    SGRY

    2002-03

    52

    44

    62

    36

    194

    SGRY

    2003-04

    23

    21

    29

    41

    114

    SGRY

    2004-05

     

     

     

     

     

    10

    Bezera

    EAS

    2001-02

    3

    4

    --

    13

    20

    JGSY

    2001-02

    7

    26

    --

    26

    59

    SGRY

    2002-03

    42

    38

    24

    96

    200

    SGRY

    2003-04

    70

    37

    22

    64

    193

    SGRY

    2004-05

     

     

     

     

     

    11

    Hajo

    EAS

    2001-02

    12

    2

    -

    40

    53

    JGSY

    2001-02

    77

    2

    -

    45

    124

    SGRY

    2002-03

    94

    72

    78

    66

    310

    SGRY

    2003-04

    74

    24

    42

    102

    242

    SGRY

    2004-05

    11

     

    36

    1

    48

    12

    Kamalpur

    EAS

    2001-02

    20

    12

    -

    28

    60

    JGSY

    2001-02

    31

     

    76

    29

    136

    SGRY

    2002-03

    70

    32

    42

    58

    162

    SGRY

    2003-04

    72

    18

    59

    34

    183

    SGRY

    2004-05

    68

    54

    55

    25

    202

    13

    Bihdia Jajikona

    EAS

    2001-02

    57

    8

    -

    31

    96

    JGSY

    2001-02

    63

    -

    22

    35

    120

    SGRY

    2002-03

    106

    18

    107

    116

    347

    SGRY

    2003-04

    84

    21

    54

    70

    229

    SGRY

    2004-05

    85

    24

    56

    165

    330

    14

    Rangia

    EAS

    2001-02

    55

    21

    -

    29

    155

    JGSY

    2001-02

    118

    7

    19

    42

    186

    SGRY

    2002-03

    130

    36

    255

    156

    577

    SGRY

    2003-04

    87

    24

    71

    110

    292

    SGRY

    2004-05

    26

    1

    75

    34

    136

    15

    Goreswar

    EAS

    2001-02

    62

    18

    -

    57

    137

    JGSY

    2001-02

    72

    13

    53

    26

    164

    SGRY

    2002-03

    74

    42

    178

    75

    169

    SGRY

    2003-04

    61

    20

    112

    62

    255

    SGRY

    2004-05

    77

    5

    90

    67

    239

                       

     

             

     

    12. Assets created under SGsY and spl. SGsY

              Lists of assets created under SGRY with effect from 2001-02 to 2004-05 and the list of assets created under Spl. SGRY for the period from 2000 to 2003 are shown in the enclosed Satements.

     

    Year

    Sl.

    No

    Name of Scheme

    Scheme Value

    (in lakhs)

    Expen-diture

    Physical Achieve-ments

    (in %)

    2001-02

    to

    2004-05

    1

    Market shed at Kahikuchi under Rani Dev. Block

    15.00

    12.95

    85%

    2

    Weaving Complex at Pachim Chaygaon under Chaygaon dev. Block

    10.00

    8.00

    80%

    3

    Market shed at Jajikona weekly market, Bihdia Jajikona Dev. Block

    15.00

    14.03

    98%

    4

    Cont'n of Production cum Training Centre (Weaving) at Bihdia

    10.00

    9.14

    98%

    5

    Market Shed at Bongshor under Sualkuchi Dev. Block

    15.00

    -

    0%

    6

    Training cum weaving production center at Uparhali Rampur Dev. block

    10.00

    7.00

    70%

    7

    Market shed at Kukurmara, Bijoynagar, Rampur Dev. Block

    15.00

    5.00

    35%

    8

    Market Shed at Boidya Garh Panchayat at chowak, Rangia Dev. Block

    15.00

    7.74

    50%

    9

    Cont'n of sub Divisional level SHG Haat at Rangia

    7.80

    3.00

    45%

    10

    Market Shed at Chamukha, Rangia Dev. block

    15.00

    14.55

    98%

    11

    Cont'n Community Fruit Preservation Centre at Boko

    2.26

    2.00

    95%

    12

    Market Shed at Boko

    15.00

    14.23

    90%

    13

    Market Shed at Natun Malibari Weekly Bazar(2002-03), Chamaria Dev. block

    15.00

    13.13

    95%

    14

    Market Shed at Mahtoli, Chamaria Dev. Block

    15.00

    14.14

    98%

    15

    Market Shed at Bagta Chowak, Hajo Dev. Block

    15.00

    7.45

    50%

    16

    Market Shed at goroimari

    15.00

    13.00

    95%

    17

    Weaving center at Bihdia village, Kamalpur Dev. Block.

    15.00

    14.55

    98%

    Total

    220.06

    159.91

    72.66%

     

     

     

     

    List of scheme under Spl. SGSY

     (Project Golden Thread)

    infrastructure w.e.f. 2000-2003

     

    Year

    Sl.

    No

    Name of Scheme

    Scheme Value

    (in lakhs)

    Expen-diture

    Physical Achieve-ments

    (in %)

    2000-03

    1

    Community Reeling & Spining Centre at Hajo

    (2 nos. @ 3.50 lakhs)

    7.00

    7.00

    100%

    2

    Community Reeling & Spining Centre at Sualkuchi (2 nos. @ 3.50 lakhs)

    7.00

    7.00

    100%

    3

    Community Reeling & Spining Centre at Bezera 1 nos.

    3.50

    3.50

    100%

    4

    Community Seed Production Centre at Rani

    3.50

    3.50

    100%

    5

    Community Seed Production Centre at Chayani Barduar

    3.50

    3.50

    100%

    6

    Community Seed Production Centre at Bongaon

    3.50

    3.50

    100%

    7

    Community Seed Production Centre at Boko (2 nos. @ 3.50 lakhs)

    7.00

    7.00

    100%

    8

    Cont'n of Yearn Bank at Sualkuchi

    3.50

    3.50

    100%

    9

    Cant'n of Market Yard cum Training Centre at Boko

    8.00

    8.00

    100%

    Total

    46.50

    46.50

    100%

    AGRI ENGINEERING DEPARTMENT

    Agricultural Engineering Department

     

    1)      Agricultural Engineering:

     

              During 2001-2002, 2600 nos of STWs were installed under ARIASP in the district with coverage of 2600 nos. of beneficiaries and 1420 acres of area. During the year, 5 nos. of tractors under ARIASP with 50% subsidy were distributed and 11 nos. of Power Tillers were distributed under Macro Management Scheme at Rs. 30,000/- subsidy. During the year 209 nos. of M.B plough, 45 nos. of P/weeder and 30 nos. of s. point were distributed under the scheme of Small Agricultural implements. 

     

              During 2002-2003, 1400 nos of STWs were installe with coverage of 796 acres of area. During the year, 52 nos. of Tractors and 150 nos. of Power Tillers have been distributed at 50% subsidy under ARIASP. Under Macro Management, Scheme 19 nos. of Power Tillers have been distributed to the Farmers at Rs. 30,000/- subsidy. During the year 47 nos. of Thresher Machins, 1024 nos. of MB Plough, 107 nos. of P/Wooden and 35 nos. of S/Points were distributed.

     

              During 2003-2004, Land Development works have been taken up under Macro Management Scheme with total estimated cost of Rs. 30.02 lakhs. Till now, and amount of Rs. 24.75 lakhs has been spent and 80% physical progress has been achieved. Under distribution of small Agricultural Implements 766 nos. of MB Plough, 5 nos. of P/Weeder and 513 nos of S/Points have been distributed among the farmers.

     

              During 2004-05, 600 nos. of STWs have already been installed under AACP and 780 nos. of STWs are proposed to be installed. Under Free Tractorisation Programme  in the flood affected areas, 33,997 bighas of land has been covered against 30,363 nos. of beneficiaries.

     

    2)     Agricultural Engineering:

     

              Blockwise activities under Agricultural Engineering are indicated below:

     

     

     

     

     

     

    Sl.No

    Name of Dev. Block

    Year

    STWs

    installed

    (nos.)

    Power

    Tiller distributed

    (nos.)

    Tracor Distributed

    (nos.)

    Free Tractorisation

    (bighas)

     

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

     

    1

    Rampur

    2001-02

    9

    --

     

    --

     

    2002-03

    77

    2

     

    --

     

    2003-04

    --

    --

     

    --

     

    2004-05

    --

    --

     

    2466

     

    2

    Hajo

    2001-02

    336

    --

    --

    --

     

    2002-03

    399

    31

    18

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    2159

     

    3

    Sualkuchi

    2001-02

    253

    --

    --

    --

     

    2002-03

    88

    2 nos.

    13

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    786

     

    4

    Chayani Barduar

    2001-02

    --

    2

    --

    --

     

    2002-03

    5

    2+2=4

    --

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    100

     

    5

    Rani

    2001-02

    --

    3

    --

    --

     

    2002-03

    21

    5

    --

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    300

     

    6

    Chaygaon

    2001-02

    46

    --

    --

    --

     

    2002-03

    9

    5

    --

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    1399

     

    7

    Boko

    2001-02

    36

    --

    --

    --

     

    2002-03

    12

    12

    1

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    2575

     

    8

    Bongaon

    2001-02

    30

    -

     

    --

     

    2002-03

    5

    1

     

    --

     

    2003-04

    --

    --

     

    --

     

    2004-05

    107

    (Proposed)

    --

     

    1498

     

    9

    Chamaria

    2001-02

    184

    --

    --

    --

     

    2002-03

    316

    --

    --

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    2992

     

    10

    Goroimari

    2001-02

    198

    --

    -

    --

     

    2002-03

    66

    6

    1

    --

     

    2003-04

    --

    --

    --

    --

     

    2004-05

    --

    --

    --

    2508

     

    11

    Bezera

    2001-02

    132

    --

    --

    --

    2002-03

    300

    10

    3

    --

    2003-04

    57

    --

    --

    --

    2004-05

    --

    --

    --

    2492

    12

    Kamalpur

    2001-02

    121

    --

    --

    --

    2002-03

    47

    11

    2

    --

    2003-04

    --

    --

    --

    --

    2004-05

    --

    --

    --

    3081

    13

    Goreswar

    2001-02

    71

    --

    --

    --

    2002-03

    48

    8

    1

    --

    2003-04

    --

    --

    --

    --

    2004-05

    --

    --

    --

    2690

    14

    Bihdia Jajikona

    2001-02

    46

    --

    --

    --

    2002-03

    21

    7

    1

    --

    2003-04

    --

    --

    --

    --

    2004-05

    --

    --

    --

    --

    15

    Rangia

    2001-02

    505

    --

    --

    --

    2002-03

    109

    30

    6

    --

    2003-04

    --

    --

    --

    --

    2004-05

    --

    --

    --

    2912

                         

     

     

    STATEMENT OF ACHIEVEMENT OF DIFFERENT AGRICULTURAL ENGINEERING SCHEMES OF AGRICULTURAL DEPARTMENT

     W.E.F 2001-2002 TO 2004-2005 (4 YEARS) WITHIN KAMRUP DISTRICT

     

    Sl. No

    Year

    Name of the scheme/Programme

    Total fund involved

    (in lakh)

    Total expenditure incurred

    (in lakh)

    Physical Target

    (in nos.)

    Physical Progress

    (in %)

    Beneficiaries covered

    (in nos.)

    Area covered

    (in acre)

    Remarks

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    (9)

    (10)

    1

    2001-02

    i) Installation of STW under ARIASP

    80.773

    80.29

    2600

    100%

    2600 nos.

    1420

    Balance amount of

    Rs. 0.483 lakhs is already refunded to PD ARIASP

    ii) Distribution of Tractor under ARIASP at 50% subsidy.

    --

    --

    5

    100%

    5 nos. of sub group

    --

    5 nos. of PPS covered

    iii) Distribution of Power Tiller under Macro-Management Scheme at Rs. 30,000/- subsidy

    --

    --

    11

    100%

    11

    --

    --

     

     

     

    iv) Distribution of small Agril. implements under state plan scheme.

    --

    --

    --

    --

    a) MB ploughs 209 nos.

     

    b) P/Weeder 45 nos.

     

    c) S/point 30 nos.

    --

    --

    2

    2002-03

    i) Installation of STW under ARIASP

    32.535

    32.485

    1400

    100%

    1400

    796

    Balance amount of

    Rs. 0.05 lakhs is already refunded to PD, ARIASP

    ii) Distribution of Tractor under ARIASP at 50% subsidy.

    --

    --

    52

    100%

    52 nos PPS

    --

    --

    iii) Distribution of Power Tiller under ARIASP at 50% subsidy.

    --

    --

    150

    100%

    150

    --

    --

    iv) Distribution of Power Tiller under Macro-Management Scheme at Rs. 30,000/- subsidy

    --

    --

    19

    100%

    19 nos.

    --

    --

    v) Distribution of Threser Machine Under ARIASP

    --

    --

    47

    1%

    1

    -

    Due to non receipt of demand target could not be achived

    vi) Distribution of Small Agril. Implements under state plan scheme.

    --

    --

    --

    --

    a) M.B. Plough 1024 nos.

    b) P/Weeder 107 nos.

    c) S/Points 35 nos.

     

    As per list available in the register in the office

    3

    2003-04

    i) Land development works under Macro Management scheme

    30.02995

    24.74935

    --

    80%

    --

    --

    Details are shown in the enclosed report sub division wise & Block wise

    ii) Distribution of small Agril. implements under plan scheme

    --

    --

    --

    --

    a) MB plough 766 nos.

    b) P/Weeder 54 nos.

    c) S/Point 513 nos.

    --

     

    4

    2004-05

    i) Installation of STW under AACP

    --

    --

    600

    25%

    780 nos. (to be covered)

     

     

    ii) Free Tractorisation in the flood effected area.

    --

    --

    Target Kamrup (Rural) 34,047 B

     

     

    97%

    33,997 (Rural)

     

     

    33,997 Bigha

    Under process as the scheme is under Bank loan. Application have been forwarded to Bank.